Update: San Bruno Grade Separation

Caption: Foundation pour for Bent 2 of the San Mateo Ave Undercrossing, which is one of the three bridges being built concurrently. 

San Bruno Grade Separation Program, $90 Million 

Ghirardelli Associates, Inc. is providing construction inspection services for this Peninsula Corridor Joint Powers Board project. Project scope includes raising the railroad in a retained embankment and lowering roadway crossings. The San Bruno Caltrain station will be relocated onto an elevated structure.