Table Mountain Blvd. Roadway Improvements & Roundabout – Oroville, CA
The Table Mountain Boulevard Roadway Improvements and Roundabout Project consists of constructing new roundabout improvements at the intersection of Table Mountain Boulevard/Nelson Ave/Cherokee Rd to include a 90-foot diameter landscaped and irrigated center island with truck apron, 13 new streetlights and associated underground conduit, 4 new splitter island and crosswalks, 3,000 linear feet of new curb/gutter/sidewalk, and 7 pedestrian ramps.
Work includes removal of existing curb, gutter, sidewalk, and roadway, installation of new and re-located/re-installed street signs, thermoplastic striping and markings, combination electric pedestal and irrigation controller and PG&E service drop, storm drain, water main, and sewer main improvements and construction of new roadway structural section consisting of approximately 44,000 square feet of HMA paving.
KEY PROJECT ELEMENTS
• Construction Inspection Services
• Sidewalk and Roadway Removal and Installation
• Storm water, water main, and sewer main improvements
• HMA Paving Operations