Echo Summit Sidehill Viaduct Replacement

Echo Summit Sidehill Viaduct Replacement – El Dorado County, CA

This $14.1 million project will replace the Echo Summit Bridge, which is located in El Dorado County, 7 miles west of the city of South Lake Tahoe, along U.S. Highway 50 near Echo Summit. At the project location, the road width is very narrow and confined by a vertical rock cut slope on the mountain side and a nearly vertical downward slope on the Basin side.

The existing bridge, which was built in 1939, will be replaced with a new structure that meets current seismic and safety standards. Construction started in May 2019. Work for this project includes a full closure of U.S. Highway 50 to install seven 96-foot bridge girders, in addition to demolishing the existing bridge.

Ghirardelli is providing support to structure construction for bridge demolition/removal, girder placement, placement of ultra high performance concrete (UHPC), bridge approach slabs, barrier rails and a polyester concrete deck.