CM Services for Hercules Intercity

City of Hercules Intermodal Transit Center, San Francisco Bay Trail, CCTA – Hercules, CA

This High Profile FHWA project involved the construction of approximately 0.63 miles of paved Class 1 trail connecting the existing SF Bay Trail at the Victoria by the Bay residential area to the interim trail extension at John Muir Parkway. Construction also included approximately 57,000 cubic yards of excavation, grading, approximately 3,400 LF of soil nail retaining walls adjacent to UPRR live tracks with a maximum height of 22 feet, Caltrans Type 1 CIP retaining walls, sewer and storm drain relocation, culvert installation, fencing, irrigation, and planting.