The Anza Pump Station, located on Highway 1 at San Pedro Beach, was damaged by a fire in March 2020. The $3.7M rebuild project involves installing two 200 HP natural gas engines, new drive shafts, gas piping, irrigation sump pumps, a new metal roof, and updated electrical and control systems. Ghirardelli provided construction management services, overseeing contractor work, inspections, and daily reporting on labor, equipment, materials, and progress.