Ghirardelli Supports BART Shutdown Weekend in Hayward, CA

GHIRARDELLI SUPPORTS BART SHUTDOWN WEEKEND IN HAYWARD, CA

POSTED: OCTOBER 5, 2021

Another busy shutdown weekend in Hayward for the San Francisco Bay Area Rapid Transit! BART’s in-house construction division successfully replaced a #15 left hand turnout, 400 feet of SS Capped Conductor Rail & associated train control equipment.

Ghirardelli is proud to support the San Francisco Bay Area Rapid Transit!

Ghirardelli Supports BART RR Track Interlocking Replacement

Ghirardelli Supports BART RR Track Interlocking Replacement

POSTED: SEPTEMBER 28, 2021

The San Francisco Bay Area Rapid Transit (BART) RR Construction team is busy making their final checks on the NorTrak #15 left hand turnout that will be installed this weekend in Hayward.

We are proud to support BART & their RR Track Interlocking Replacement Program!

BART A75 Interlocking Replacement Project Comes to a Close

Another success for the San Francisco Bay Area Rapid Transit (BART), as the A75 Interlocking Replacement Project is coming to a close. The fourth & final turnout was replaced during the third & final shutdown weekend this summer.

Ghirardelli Associates is currently supporting the San Francisco Bay Area Rapid Transit to prepare the A75 Interlocking to be reopened to BART revenue service later this month.

We are proud to be a part of the on-schedule & within budget, RR Track Interlocking Replacement Program.

BART A75 Interlocking Pre-Construction to Commence April 2021!

BART A75 Interlocking Pre-Construction to Commence April 2021!

BY: KELLI RICHARDS, COMMUNICATIONS MANAGER | APRIL 9, 2021

This month, pre-construction works at the BART A75 Interlocking will commence. Ghirardelli will be supporting BART & their contractor during the replacement of the A75 Interlocking in Hayward, as part of the Bond Measure RR Track Interlocking Replacement program.

This spring / summer, BART & their contractor will be replacing track switches and upgrading train control, traction power & communication assets in the Hayward area.

Ghirardelli Associates is proud to continue to support the District on their sixth track interlocking replacement in the last 28 months.

BART R65 Shutdown Weekend #3

BART R65 Shutdown Weekend #3

BY: KELLI RICHARDS, COMMUNICATIONS MANAGER | FEBRURARY 16, 2021

Another holiday weekend, another switch replacement! Over the past six weeks, three out of four turnouts have been replaced north of the BART Richmond station.

The fourth and final switch, a #15 LH turnout will be replaced over the last weekend of February 2021.

Ghirardelli Associates is proud to support the BART Maintenance and Engineering group with their Track Interlocking Replacement Program.

BART R65 Shutdown Weekend #2

BART R65 Shutdown Weekend #2

BY: KELLI RICHARDS, COMMUNICATIONS MANAGER | FEBRUARY 5, 2021

Ghirardelli Associates provided construction management support to the San Francisco Bay Area Rapid Transit, as part of the Bond Measure RR Program.

During the second shutdown of the year, BART District forces replaced a #15 equilateral turnout, and associated traction power and train control assets. The largest crane in the history of BART Maintenance & Engineering was used again to install track panels between revenue service windows.

Another switch replacement was delivered on schedule, with zero injuries or incidents! We are proud to support the BART M&E dream team.

BART R65 Shutdown Weekend #1

BART R65 Shutdown Weekend #1

BY: KELLI RICHARDS, COMMUNICATIONS MANAGER | JANUARY 21, 2021

During Martin Luther King Jr. holiday weekend 2021, Ghirardelli Associates provided construction management support to the San Francisco Bay Area Rapid Transit, as part of the Bond Measure RR Program.

BART District forces replaced a #15 right-hand turnout, & associated traction power & train control assets. The largest crane in the history of BART Maintenance & Engineering was used to install track panels between revenue service windows.

Another switch replacement was delivered on schedule, with zero injuries or incidents, & we are proud to support the BART M&E dream team.