Posts by Cameron Hagans

2013 Grand Boulevard Award!

Congratulations to the City of Palo Alto and our construction management team for their participation on the El Camino Real/Stanford Ave Streetscape Improvements project. The awards recognize projects and public agency plans in the El Camino corridor that exemplify the Grand Boulevard Initiative’s Guiding Principles. Read more: http://www.grandboulevard.net/about-us/guiding-principles.html

Read More

In The Field: Port of Oakland, BART Oakland Airport Connector Project

Segment 3, Doolittle Subway U-Wall and Tunnel BART, using Flatiron/Parsons Design Build, is building a connecting light rail track from the Coliseum Station to the Oakland Airport, with an elevated station at the OAC, incorporating at grade, elevated and tunnel track. Segment #3 pictured is the Subway Tunnel Segment, which extends from the SE side…

Read More

Update: San Bruno Grade Separation

Caption: Foundation pour for Bent 2 of the San Mateo Ave Undercrossing, which is one of the three bridges being built concurrently.  San Bruno Grade Separation Program, $90 Million  Ghirardelli Associates, Inc. is providing construction inspection services for this Peninsula Corridor Joint Powers Board project. Project scope includes raising the railroad in a retained embankment…

Read More