|
Register

ghirardelli assoc logo

Call Today!

510-451-4180

Ghirardelli Associates News

  • Home
    Home This is where you can find all the blog posts throughout the site.
  • Categories
    Categories Displays a list of categories from this blog.
07
May

Update: San Bruno Grade Separation

Posted by on in Projects
  • Font size: Larger Smaller
  • Hits: 505
  • Print

Caption:  Foundation pour for Bent 2 of the San Mateo Ave Undercrossing, which is one of the three bridges being built concurrently. 

San Bruno Grade Separation Program, $90 Million
Ghirardelli Associates, Inc. is providing construction inspection services for this Peninsula Corridor Joint Powers Board project.  Project scope includes raising the railroad in a retained embankment and lowering roadway crossings.  The San Bruno Caltrain station will be relocated onto an elevated structure.

Cameron Hagans has not set their biography yet